Bridge Street widening update (Aug. 16, 2024)*
- Working hours will take place from 7 a.m. to 5 p.m., Monday through Friday.
- Bridge Street traffic realignments will continue between 22nd and 42nd Avenue next week, with operations concentrated on the south side of the roadway. One through-lane of traffic will remain open in either direction throughout the week. There will be designated turn areas to for business access, with some temporary restrictions throughout the duration
of work. At least one entry point will remain open for all businesses and residents along Bridge Street.
- Additional localized closures may take place throughout the project corridor next week for utility work.
- Telluride Street will remain closed from Bridge Street to Longs Peak Street through the week. Drivers will be rerouted on 42nd Avenue or 19th Avenue to access the north end of Telluride Street. To access the Fairview Cemetery, please use Frala Court. Please see the detour map below for additional navigation details. This closure is expected to be in place 24/7 for up to four weeks to install storm sewer infrastructure across the roadway.
- For drivers traveling westbound on Bridge Street, there will be no left turns onto 27th Avenue. Drivers are encouraged to continue west to make a lefthand turn at 22nd Avenue.
- Speed limit reductions are in place within the project zone. Additional traffic enforcement will be patrolling the construction zone to ensure the safety of the project team and traveling public.
- Trucks and heavy equipment will continue to enter and exit the roadway within the project zone, so drivers are encouraged to slow down, watch for workers and equipment, and leave plenty of space in between vehicles. Please be mindful and exercise extreme caution when traveling through construction areas.
- Please note that construction will continue on Bridge Street as the school year starts back up again. Parents, students, teachers and staff should allow for extra time to navigate the work zone during pick-up and drop-off hours. The project team thanks you for your continued patience.
*All schedules are subject to change based on weather and material availability.